Problem
Restrooms in China are manageable, but they work differently enough to catch first-timers off guard. Squat toilets are still the norm — a seated toilet is usually only the one accessible stall. Toilet paper and soap are often missing entirely, and in older buildings the toilet cannot flush paper: used paper goes in the bin next to the toilet instead. The reliable way to find one is searching “厕所” in Amap; the most reliable restrooms are in big malls, airports, and newer metro stations.
What Changed Recently
Newer malls, airports, and metro stations increasingly have seated toilets and better supplies, but older buildings and street-level restrooms still follow the old pattern. The rule has not changed: carry tissues and hand sanitizer everywhere, because you cannot count on either being provided.
Step-by-step
- Carry tissues and hand sanitizer in your day bag every day — paper and soap are often missing, and this is the single most common restroom surprise.
- If you need a seated toilet, check multiple stalls before giving up — it is usually the one accessible stall, marked 无障碍.
- When you need a restroom urgently, head for a big mall, an airport, or a newer metro station instead of wandering. In Amap, search “厕所” to find the nearest one.
- Follow the disposal setup you see in that restroom: if a bin is provided for paper, use it — in older buildings paper goes in the bin, not the toilet.
- Use the restroom before a long metro ride or a long queue at a major attraction, and keep bags off wet floors.
- Look for 无障碍 (accessible) or family restrooms in malls and stations if you need more space or are traveling with kids.
Failure Cases
- Arriving with no tissues and finding no paper at all.
- Expecting every stall to be a seated toilet.
- Flushing paper in an older building where the bin is the rule.
- Wandering randomly for a restroom instead of heading for a mall, airport, or metro station.
- Putting bags on wet floors or leaving them behind in a rush.
Checklist
- Primary setup completed before departure
- Backup method prepared
- Offline copy saved
- First-day test action completed